Tuesday, December 6, 2011

Operation mounting earl bag

Rubber mounts. 2 each, top and bottom.




- Posted using BlogPress from my iPhone

Hammerform part 4: the back side

Something I haven't talked about is annealing the aluminum before you try to form it, so here goes.
-use a dirty acetylene only flame to put a layer of soot on the surface
-change the oxy-acet flame to a neutral flame and heat the entire piece until you make the soot disappear and reveal nice clean alum
-let the alum air cool, and it's annealed








I decided to hammer the back panel of the oilbag, so it's back to the buck.




Fitted





Welded





Top mounts


Italian eye candy




I have a soft spot for Guzzis

Sunday, December 4, 2011

Hammerform part 3: oilbag side/top


Starting to bend the annealed sides to the form.




I drill some holes in the sides of the oilbag, screws/washers help hold them to the form while tacking together.



Grind a bit of the hammerform away so as not to dirty the weld tack areas with charred mdf.



Mark the tacking areas with the sharpie.




Fully welded.



Cleaned up.



Another mocking.

Acme springer




We just got the Acme narrow springer in for a customer's pre-unit build, and its totally bad-ass. If you've never seen one of their springers before, I can't even tell you how nice the machining/design/fabrication is on them.

Thursday, December 1, 2011

Hammerform part 2: operation ironhead oilbag


Roll a few beads on what's to be the top of the oilbag.



Top support to hold the aluminum to the hammerform without marking it.





Line up and make an mdf and alum sandwich.


Start hammering. Go slow and even as you make your way around, taking extra care at the corners. Use a plastic faced mallet (or some other non-marring hammer) to keep from marring the surface of the alum too much.





Finished top piece.



Next I'll be tackling the sides.

running wires








A little more cleaning up and we can run some wires and put the controls on.